There will be a new trailer soon- in the meantime, here's another chance for a sneak peek. The old link is dead- long live the new link!
http://www.blip.tv/file/3007245
Tuesday, December 22, 2009
Tuesday, December 8, 2009
Post-production update
Hya Folks
Post-production is always a slow process- but here's the scoop so far. The movie is edited and color corrected. The score is currently being worked on by Christopher Nickel and Daniel Levin. I've heard some of the music and it sounds great! More news to come- we're hoping to screen in late winter or early spring. Here's a pic of Mark Courneyea as The Scarab for a promo appearance we did at Toronto's FanExpo. C-Ya later!
Sunday, October 18, 2009
The Scarab comic is now available!
Monday, July 13, 2009
Wednesday, April 1, 2009
Monday, March 30, 2009
the Scarab merch
Sunday, March 29, 2009
The Finish Line
We're done most of the principal photography. Everything that was scheduled- is now in the can. We added a couple of "golden age" scenes to the script since we started shooting- we're going to shoot those in early July. Things went phenomonally well- we had some amazing martial artists out this weekend to shoot some action sequences. My body aches and all I did was watch them :)
Thanks to everyone who helped us get this far- as usual, here are a couple of pix.
Friday, March 27, 2009
cool poster
Hey
Check it out- Kevin McMillan, one of the extras who played a thug in the movie- whipped us up a cool poster- I liked it so much- I thought I'd show you all. This is not the final movie poster- but we thank Kevin for sending it to us all the same- well done.
In other news- another one of our extras- Yves Drouin- is featured in his local paper as having appeared in our movie- you can see the article this week only at http://visionrockland.editionap.ca/- Enjoy
Monday, March 16, 2009
New Pix from THE SCARAB
Sunday, March 8, 2009
First pic of THE SPHINX
Monday, February 23, 2009
Second Weekend Completed
Days 3 and 4 are wrapped. We once again got some great stuff in a good stretch of time. Our scheduling has been bang-on so far and the footage is looking great. We shot day 3 at the University of Ottawa and had a large group of extras come out to play students of Professor Peter Ward (The Scarab). We were also introduced to the characters of Prof. Joab and his bodyguard Bart Hill. On Day 4, we shot in the back room and office of The Comic Book Shoppe on Bank St (thanks Jody, Joe and Rob). We filmed The Scarab and Woman in Red taking out some thugs as well as a stand-off with THE BLACK TERROR (John McLenachan). Thanks to the cast and crew for some hard work!
Tuesday, February 17, 2009
First Weekend
The first weekend of shooting has come and gone. We got some great footage and we thank the actors for putting up with the cold. Here are a few images of the WOMAN IN RED (Alix Pasquet) kicking some butt.
Thanks to Alix for being a trooper- it isn't easy wearing a superhero costume in the dead of winter.
Enjoy. Shooting resumes this coming weekend.
Tuesday, February 10, 2009
Costume fitting
Hey Folks
So- a coupla things. Firstly-the costume is mostly done for our title character. Mark Courneyea came by to try on some of the elements- I'll post a photo for all to see.
Also- in other news, Gary Peterson had to step down as the BLACK TERROR, in his place is John McLenachan.
Gary and his lovely lady just welcomed a new son into the world so his priorities must shift for the time being.
We welcome John to the production.
Tuesday, January 13, 2009
Sunday, January 11, 2009
Mark Redfield to play General Bruce Carter
Subscribe to:
Posts (Atom)